Hope on care of early babies at Paget
PLANS to end local care for premature babies appear to have been dropped, to the relief of the James Paget University Hospital.There were plans to change neonatal services in the region, which could have seen the level of care reduced at the JPH and Queen Elizabeth Hospital in King's Lynn.
PLANS to end local care for premature babies appear to have been dropped, to the relief of the James Paget University Hospital.
There were plans to change neonatal services in the region, which could have seen the level of care reduced at the JPH and Queen Elizabeth Hospital in King's Lynn.
The Norfolk and Norwich University Hospital and Addenbrooke's Hospital, Cambridge, offer neonatal intensive care - level three - while the JPH and QEH offer high dependency - level two.
In December, it was reported that the strategic health authority, NHS East of England, wants to see more level one and three units but fewer level two units.
The JPH and QEH both feared their neonatal units would be downgraded, which was the preliminary view from the Norfolk, Suffolk and Cambridgeshire Perinatal Network.
The changes would have meant about 200 sick babies a year had to travel from the JPH to the N&N.
Most Read
- 1 Man who raped teen jailed for six years
- 2 Police called to 'altercation' between pupils at Norfolk school
- 3 Yarmouth's wizard hotel to appear on Four in a Bed
- 4 Four men arrested following altercation by Great Yarmouth pub
- 5 Date set for road reopening after sewer collapse
- 6 'It's just not viable anymore' - Pub near Great Yarmouth closes
- 7 CCTV released of Great Yarmouth man whose body part was found on beach
- 8 Hospital opens £1.2m eye operation theatre to cut waiting times
- 9 'Well-respected' tattoo artist died at home after taking cocaine
- 10 TV show filmed in Norfolk starring Ainsley Harriott to air this month
Although a final decision has not yet been made, it now seems the region's specialised commissioning group may have changed its mind.
John Hemming, JPH chairman, said: “After a lot of representation, discussion, pressure and work, we seem to be working towards a relatively satisfactory status quo where we would retain our level two status.”
No one from the East of England Specialised Commissioning Group was available to comment.